Train Traction Hook

1. Train Traction Hook has good processing technology and higher precision.
2. The surface of Train Traction Hook is smooth and burr-free,
3. Train Traction Hook supports customization and complete models.

  • Information

Introduction of Train Traction Hook:

Train traction hook refers to the hooks at both ends of the train wagon or locomotive, which have the functions of connection, traction and buffering. Train traction hook is a vehicle component used to realize the connection between locomotives and vehicles or between vehicles and vehicles, transmit traction force and impact force, and keep a certain distance between vehicles.


Train traction hook

Train traction hook installation steps: 

  1. First install the suspension rod on the top of the steam locomotive, and then install the hook parts on the suspension rod;

  2.  Install a small pad under the hook to support the bottom of the hook;

  3.  Hang the hook on the suspension rod of the carriage, adjust the position and fix it with screws;

  4. Install the stainless steel pull rope, fix the terminal of the pull rope in the middle of the steam locomotive, and pass the pull rope at the other end through the suspension rod of the carriage, Then pull the drawstring out through the hook.

MAIN PARTICULARS
Heat treatment for mouldHardened, HRC50~55
Mould featuresAdvanced design,   Logical structure,   High precision,
Qualified materials, Long lifetime, Short delivery time.
Material for productgray iron/ductile Iron/alloy steel/carbon steel
StandardASTM, ASME, DIN, JIS, ISO, BS, API, EN
CertificateCE, ISO 9001:2015,RoHSIATF16949:2016
ToleranceUp to +/- 0.002mm
DimensionAs per customers' request
ProcessingStep1: Sand casting/Investment casting
Step2: CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, drilling, wire-cutting, EDM, grinding etc.
Step3: Surface treatment
SurfaceAnodize, Plating, Brushing, Polishing, Blackened, Powder coating, Sandblasting, Laser engraving, ED- Coating, Chromate Plating, Zinc Plating, Dacromat Coating, etc.
Markingas per clients' requirements
Inspectionmaterial, dimension, heat treatment, hardness, NDT, surface
QualityISO9001/IATF16949
Lead time20-30days for sample, consult with customer for mass production
DeliveryExpress for sample, ocean shipping/air for mass production
Our CapabilitiesCNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, die casting, casting, forging, stamping,sand casting/investment casting
Engineering&manufacturing servicesR&D process, tooling and gauging design, product design
Integrated CAD/CAM system, test and measuring
PackingEco-friendly pp bag / EPE Foam /Carton boxes /iron case or wooden boxes
As customer's specific requirements
OthersRecyclable, in line with environmental requirements and standards, and reliable

Corporate Culture and Vision

1. Quality is the life of the enterprise, time is the benefit of the enterprise, and customer satisfaction is the standard of the enterprise.

2. Go to work happily and get off work safely: 

3. Green water and green mountains are Jinshan and Silver Mountains: 

4. Even if you say so, just do it, roll up your sleeves and work hard! 

5. The quality policy of the factory: 

"focus on customers, continue to improve, and enhance customer satisfaction with quality products and services"


Train casting

General policy of management

1. The four mutual principles: unite, help, support and remind each other. 

2. Six management standards: Labor discipline, work quality, product quality, strict economy, civilized production and production safety. 

3. Three modernized management: standardization, procedure and institutionalization.


About our packaging

Delivery method: FOB Dalian, either by sea or by air, according to the customer's specified requirements.
Delivery time: According to the size and content of the contract.
Terms of payment: T/T.


Train traction hook

Q:Are you a factory or trading company?

A: We are factory.

Q:What do I need for offering a quote?

A: Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information.

Q:How about the MOQ?

A:MOQ depends on your need ,besides, we welcome trial order before mass-production.

Q:Can I get a quote without drawings?

A:Yes, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

Q:How long can I have the sample

A:Depends on your products and request, it usually takes 7-20days.

Q:Will my drawings be divulged if you benefit?

A: No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.

Q:Is it possible to know how is my product going on without visiting our company?

A:We will offer a detailed products schedule and send weekly reports with pictures and videos

Q: How do you control the quality?

A:Material inspection--Check the material surface and roughly dimension.

Production first inspection--To ensure the critical dimension in mass production.

Sampling inspection--Check the quality before sending to the warehouse.

Final inspection--100% inspected before shipment.

Q: What will you do if we receive defective parts?

A: Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap


Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.