Cast Iron Front Suspension Upper Control Arm

1. The front suspension Upper control arm is made of high-quality materials and durable.
2. The front suspension Upper control arm is easy to install and maintain.
3. The front suspension Upper control arm can improve the appearance and performance of the vehicle.

  • Information

Introduction of Cast Iron Front Suspension Upper Control Arm:

The role of the Cast Iron Front Suspension Upper Control Arm is to elastically connect the wheel and the body through a ball joint or bushing, as a guide and force transmission element of the automobile suspension system, and to transmit various forces acting on the wheel to the body , while ensuring that the wheels move according to a certain trajectory.


Advantages of Cast Iron Front Suspension Upper Control Arm:

1. The ast iron front suspension Upper control arm can improve the suspension of the vehicle to provide a smoother ride.

2. The ast iron front suspension Upper control arm is resistant to rust and corrosion to ensure reliable operation.

3. Ast iron front suspension Upper control arm Exact replacement parts that meet or exceed OEM specifications.

4. The ast iron front suspension Upper control arm helps to improve the stability and responsiveness of the steering system.

5. The ast iron front suspension Upper control arm is suitable for various vehicles, adding versatility to your suspension system.

suspension Upper control arm


Main specifications of Cast Iron Front Suspension Upper Control Arm:

MAIN PARTICULARS
Heat treatment for mouldHardened, HRC50~55
Mould featuresAdvanced design,   Logical structure,   High precision,
Qualified materials, Long lifetime, Short delivery time.
Material for productgray iron/ductile Iron/alloy steel/carbon steel
StandardASTM, ASME, DIN, JIS, ISO, BS, API, EN
CertificateCE, ISO 9001:2015,RoHSIATF16949:2016
ToleranceUp to +/- 0.002mm
DimensionAs per customers' request
ProcessingStep1: Sand casting/Investment casting
Step2: CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, drilling, wire-cutting, EDM, grinding etc.
Step3: Surface treatment
SurfaceAnodize, Plating, Brushing, Polishing, Blackened, Powder coating, Sandblasting, Laser engraving, ED- Coating, Chromate Plating, Zinc Plating, Dacromat Coating, etc.
Markingas per clients' requirements
Inspectionmaterial, dimension, heat treatment, hardness, NDT, surface
QualityISO9001/IATF16949
Lead time20-30days for sample, consult with customer for mass production
DeliveryExpress for sample, ocean shipping/air for mass production
Our CapabilitiesCNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, die casting, casting, forging, stamping,sand casting/investment casting
Engineering&manufacturing servicesR&D process, tooling and gauging design, product design
Integrated CAD/CAM system, test and measuring
PackingEco-friendly pp bag / EPE Foam /Carton boxes /iron case or wooden boxes
As customer's specific requirements
OthersRecyclable, in line with environmental requirements and standards, and reliable


How the Cast Iron Front Suspension Upper Control Arm works:

ast iron front suspension Upper control arm is an important part of the vehicle suspension system. When bumps or potholes are encountered, the control arms absorb the shock and keep the vehicle stable. The ast iron front suspension Upper control arm also helps maintain proper alignment and reduces tire wear. Enjoy a smoother ride and better handling with the control arms.


About our packaging:

In order to make sure that the product is in good condition when it reaches the customer's address, we strictly control the quality of the product and pack each product carefully, all in order to give the customer a better experience.

Delivery method: FOB Dalian, either by sea or by air, according to the customer's specified requirements.
Delivery time: According to the size and content of the contract.
Terms of payment: T/T.

front suspension Upper control arm


Q:Are you a factory or trading company?

A: We are factory.

Q:What do I need for offering a quote?

A: Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information.

Q:How about the MOQ?

A:MOQ depends on your need ,besides, we welcome trial order before mass-production.

Q:Can I get a quote without drawings?

A:Yes, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

Q:How long can I have the sample

A:Depends on your products and request, it usually takes 7-20days.

Q:Will my drawings be divulged if you benefit?

A: No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.

Q:Is it possible to know how is my product going on without visiting our company?

A:We will offer a detailed products schedule and send weekly reports with pictures and videos

Q: How do you control the quality?

A:Material inspection--Check the material surface and roughly dimension.

Production first inspection--To ensure the critical dimension in mass production.

Sampling inspection--Check the quality before sending to the warehouse.

Final inspection--100% inspected before shipment.

Q: What will you do if we receive defective parts?

A: Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap




Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.